Kinetic Case Studies
“Kinetic IT were quick to notice the importance of the rapidly changing deliverables and made every effort to be flexible and help facilitate the desired client changes.“
Alan Ginty
Tech IBI Installation Planner, Sky
Read the full Imperial College London Case Study
“The physical build provided by Kinetic IT has been of very high quality, the relationship has been strong and the result is something we are truly proud of.“
Paul Jennings
Head of ICT, Operations and Programme Sponsor, Imperial College London
Read the full IOMART Case Study here
“We were able to work closely with Kinetic who provided us with clear and detailed plans of every aspect of the operation, and that thorough planning was underpinned by their dedication to providing a first-class service.“
Neil Johnston
Group Operations Director, IOMART
Read the full University of Chicago Case Study here
“Throughout the project the Kinetic team was professional, competent, attentive to quality, great problem solvers and identified issues early on for corrective action.“
Nick Nichols
UChicago Booth Project Manager, Facilities Services- Capital Project Delivery
Read the full Avid Technology Case Study here
“The whole team was extremely supportive, detail oriented, focused, patient and collaborative and although the time, budget and resources on our end were limited, they did extraordinary work to support us and get us to the finish line on timeā¦and with a smile!“
Karen Powell-Evans
Global Workplace Project Manager, Avid Technology
Read the full Adobe Case Study here
In partnership with FGD Solutions, Kinetic IT enabled Adobe to carry out a large refresh project of their key storage infrastructure across their UK and Amsterdam Data Centre sites.
As a result our joint work, Adobe have accrued a strong financial revenue return.
Read the full Global Bank Case Study here
From the outset, our client was keen to build a robust and reliable IT Asset Disposition (ITAD) solution in the UK, that could then be replicated across all other locations within the EMEA region.
Kinetic and FGD have developed a close and responsive relationship with our client over the past few years of working together, with continued involvement from a number of key contact points from both parties.
Read the full Thurrock Council Case Study here
The Kinetic / FGD partnership first began working with Thurrock Council in 2019, who were looking for an all-in-one solution for a range of projects including data centre installation, media destruction and desktop refresh and recycling.
Kinetic IT has a long established and trusted partnership with FGD Solutions, using their combined expertise to offer industry leading solutions with unparalleled experience.

